SA Geodata Database - Drillhole Details
Drillhole:
262025
Drillhole Name:
IHAD3
 
Details LocationStratigraphyLithologyPetrophysics Core Details Spectral Scanning Rock Samples Historical Documents References
PACE Drillhole
N
PACE Round
Representative Drillhole From a Larger Program
Y
Drillhole Program Comments
Intercept Hill Project
Map / Unit Number
633500465
Max Drilled Depth (m)
1027.5
Max Drilled Date
05/09/2007
Cored Length
Tenement
EL 3084
Operator
Argo Exploration Ltd.
Target
Gold, Base Metals
General Comments
Diamond drilling trageting geophysical anomalies associated with IOCGU mineralisation style of Olympic Dam.
Dip
-90
Azimuth
0
Class