SA Geodata Database - Drillhole Details
Drillhole:
262024
Drillhole Name:
IHAD2
 
Details LocationStratigraphyLithologyPetrophysics Core Details Spectral Scanning Rock Samples Historical Documents References
PACE Drillhole
N
PACE Round
Representative Drillhole From a Larger Program
Y
Drillhole Program Comments
Intercept Hill Project
Map / Unit Number
633500464
Max Drilled Depth (m)
1158.8
Max Drilled Date
08/08/2007
Cored Length
Tenement
EL 3084
Operator
Argo Exploration Ltd.
Target
Gold, Base Metals
General Comments
Diamond drilling trageting geophysical anomalies associated with IOCGU mineralisation style of Olympic Dam.
Dip
-90
Azimuth
0
Class
Core Images
 
 
SA Geodata - Database Information Downloads
Explanation of the Stratigraphic Map Symbol and GIS code system