SA Geodata Database - Drillhole Details
Drillhole:
162408
Drillhole Name:
RD308
 
Details LocationStratigraphyLithologyPetrophysics Core Details Spectral Scanning Rock Samples Historical Documents References
PACE Drillhole
N
PACE Round
Representative Drillhole From a Larger Program
Y
Drillhole Program Comments
Olympic Dam
Map / Unit Number
623700129
Max Drilled Depth (m)
607.8
Max Drilled Date
05/04/1982
Cored Length
Tenement
SML 1
Operator
BHP Billiton OD Corp. Pty Ltd.
Target
Gold, Base Metals, Copper
General Comments
Drilling targeting IOCGU style mineralisation.
Dip
-89.9
Azimuth
207.47
Class